A brief update
Uthman Ibn Affan Reported
The Messenger of Allah, peace and blessings be upon him, said, “Whoever builds a mosque for Allah, then Allah will build for him a house like it in Paradise.”
SOURCE: SAHIH AL-BUKHARI 439, SAHIH MUSLIM 553
Timeline
SEPT - NOV 2007​
​
FOUNDATION
​
Large rocks in the ground were broken down and taken out. Sewage and various piping was set in along with the walls of the Mosque.
SEPT 2011 - NOV 2012​
​
OUTER SHELL
​
With the steel in place, siding and roofing was installed in addition to masonry (brick work). Other miscellaneous parts like the custom made marble slab prints for the entrance were also added.
AUG 2014​
​
ENTRANCE EXCAVATION
​
After the foundation had been done, the entrance to the building was higher than the rough ground level. During this period, the entrance way to the building was dug and formed.
DEC 2014​
​
2ND ENTRANCE FOUNDATION
​
Most of this step consisted with setting up the steel and cement foundation to the entrance nearest to the fence along Lagrange Avenue.
JUNE 2007​
​
SITE CLEARING
​
During this period all garbage was disposed of, trees that were in the way were cut down and a fence outlining the land was put in place.
OCT 2010 - AUG 2011​
​
MAIN STEEL STRUCTURE
​
At this stage the skeleton of the building was welded and bolted firmly to the foundation. The metal roofing was also completed at this stage.
DEC 2013​
​
INTERIOR WORK
​
Once the exterior was completed and resistant to the harsh winters, the interior heated flooring and metal stair structure were installed.
SEPT 2014​
​
SITE GRADING & LEVELING
​
The ground level was raised and flattened to match the height of the entrance all around the site.
TODAY​
​
CURRENT STATE
​
Minor water leaks have been found and repaired over time. The interior is all cleaned up and ready for the next final steps that will grant ISNH the certificate of occupancy.
Progress
Current status
BREAKING GOUND & EXCAVATION
100%
FOUNDATION
100%
-
concrete forms
-
pour foundation wall
-
concrete slab pour:
- gravel
- rebar
- rigid foam
​
UTILITIES
68%
-
sewer, electrical, water, gas
FRAMING
80%
-
balloon framing
-
sheathing
-
roof
-
stairs
-
windows
ROOFING
100%
PLUMBING
90%
LIGHTING & ELECTRICAL
72%
-
ambient
-
accent
-
perimeter
-
task
INSULATION
50%
DRYWALL
0%
-
sheetrock
-
mudding
-
sanding
-
primer
FLOORING
TILING
PAINTING
CABINETS & SHELVING
FINALIZE PLUMBING & ELECTRICAL/LIGHTING
0%
0%
0%
100%
0%
CERTIFICATE OF OCCUPANCY
TO MOVE IN
54%
In order to attain the certificate of occupancy the mosque requires an additional $2.5 million. This will allow us to complete all essential aspects of the facility and put the non essential items on hold until after occupancy. We welcome your support with monetary donations, material donations, volunteer labor, interest free loans, or worldwide fund raising in an effort to obtain certificate of occupancy by November 2019. Full completion needs an estimated $4 million.
Prophet Muhammad PBUH Narrated
“Among what continues to accrue for a believer of his good works after death are the following: knowledge that he learned and then imparted to others, a pious child whom he left behind, a copy of the Qur’ân that he bequeathed, a mosque that he built, a guest house he built for travelers, a river that he made to flow, and charity he spends from his wealth when he is in good health – all of this continues to avail him after his death.”